Studio Insights.
A running record of how Korda works, what we build with, and what we learn.
(06)
(06)
(06)
All
Studio Practice
Materials
Process
We set the daylight study before the first plan, because a room’s hours decide its purpose.

Studio Practice
Sep 18, 2026
Why We Draw the Daylight Before the Plan.

Studio Practice
Sep 18, 2026
Why We Draw the Daylight Before the Plan.
Lime plaster costs more to apply and less to keep, and it changes how a wall meets the light.

Materials
Aug 7, 2026
The Case for Lime Plaster in Coastal Houses.

Materials
Aug 7, 2026
The Case for Lime Plaster in Coastal Houses.
A fixed four-week opening stage, priced separately, so both sides can leave before the expensive part begins.

Studio Practice
Apr 14, 2026
How We Scope a Project in Four Weeks.

Studio Practice
Apr 14, 2026
How We Scope a Project in Four Weeks.
A 1930s warehouse on the Setúbal waterfront, reduced to its frame and rebuilt as one long room.

Process
Jun 11, 2026
The Harbor House, Reduced to Its Frame.

Process
Jun 11, 2026
The Harbor House, Reduced to Its Frame.
The first fifty drawings of any project are made in pencil, at a desk, before a file is opened.

Process
Jul 2, 2026
Two Weeks of Pencil Before the First File.

Process
Jul 2, 2026
Two Weeks of Pencil Before the First File.
We revisited four floors we laid between 1996 and 2004 to see what the oil, the traffic, and the light had done.

Materials
May 20, 2026
Four Oak Floors, Thirty Years Later.

Materials
May 20, 2026